Menentukan Bagian Pekerjaan Yang Sering Menyimpang Pada Pelaksanaan Proyek Konstruksi Bangunan Gedung
Sari
Referensi
Aaker, D. A., Kumar, V., Day, G. S., and Leone, R. P., 2011. Marketing Research, Jonh Wiley & Sons (Asia) Pte Ltd. U.S.A.
Austen, A. D. and Neale, R. H. (1991), Manajemen Proyek Konstruksi, PT. Pustaka Binaman Pressindo, Jakarta.
Burati, J. L., Farrington, J. J., and Ledbetter, W. B., (1992), Caurses of Quality Deviation in Design and Construction, Journal of Construction Enineering and Management, Vol. 118.
Barrie D.S. and Paulson B.C. JR. (1992) “Professional Construction Management”, McGraw-Hill International Edition.
Davis, K., Ledbetter, W. B., and Burati, J. L., (1985), meansuring design and construction quality cost, Journal of Construction Enineering and Management, ASCE, Vol. 115 (3)
Ireland, L. R. (1991), Quality Management for Project and Programs, Project Management Institute.
Letbetter. W. B., (1994), Quality Performance on Succesful Project, Journal of Construction Engineering ang Management, Vol. 120.
Newman, W.H., (1977) ”The Process of Managemen”, Prentice Hall, India.
Soekoto, I., (1987), Pengendalian Pelaksanaan Konstruksi, Departemen
Siegel, S. (1997), Stastistik Nonparametrik untuk Ilmu Sosial, PT. Gramedia Pustaka Utama, Jakarta.
Wah, L. S., Min L. C., and Ann T. W., (1994), ISO 9000 In Construction, McGraw-Hill Book Co, Singapure.
Rothery, B., (1995), Analisis ISO 9000, PT. Pustaka Binaman Pressindo, Jakarta.
Wahana Komputer dan Andi, (1997), Analisis Stastistik Nonparametrik (SPSS 7.5), Andi Offset, Yogyakarta.
Refbacks
- Saat ini tidak ada refbacks.