PERBEDAAN KOMITMEN DAN KINERJA ANTARA MANAJER PROYEK KONSTRUKSI BESAR DENGAN MANAJER PROYEK KONSTRUKSI KECIL MENGGUNAKAN PENDEKATAN ANALISIS DISKRIMINAN
Sari
ABSTRACT: This study aims to analyze, first, the difference of commitment between big and small construction project managers, second, the difference of performance between big and small construction project managers. In particular, the commitment has eleven (11) discriminating indicator variables and the performance has nine (9) discriminating indicator variables. The results of study using the discriminant analysis approach indicate that from the eleven (11) indicator variables of commitment only two (2) indicator variables that discriminate big and small construction project managers, namely a. Y15 = you are very concerned with the fate of this company, b. Y110 = this company highly respects your values and goals, and from the 9 (nine) indicator variables of performance only one (1) indicator variable that discriminates big and small construction project managers, namely Y26 = the attitude towards work implementation.
Teks Lengkap:
PDFReferensi
An, N., Qiang, M., Wen, Q., Jiang, H., & Xia, B. (2019). Contribution of project managers’ capability to project ending performance under stressful conditions. European Management Journal, 37(2), 198–209. https://doi.org/10.1016/j.emj.2018.04.001.
Al-Hajj, A., & Zraunig, M. M. (2018). The Impact of PM on Successful Completion of Projects. International Journal of Innovation, Management and Technology, 9(1), 7. https://doi.org/10.18178/ijimt.2018.9.1.781.
Allen, N. J., and Meyer. J. P., 1996. ”Affective, Continuance, and Normative Commitment to the Organization: An Examination of Construct Validity”. Journal of Vocational Behavior, 49 (3) : 252-276.
Armstrong, M., 1994. “Performace Management”. Alih Bahasa : Toni Setiawan, Tugu Publisher, Yogyakarta.
Araújo, C. C. S. de, Pedron, C. D., & Silva, F. Q. P. de O. e. (2018). IT Project Manager Competencies and Team Commitment: A New Scale Proposal. Revista de Gestão e Projetos, 9(1), 39–57.
Bayani bt Zakaria, I., Redhuan Bin Mohamed, M., bt Ahzahar, N., & Zubaidah bt Hashim, S. (2015). A Study on Leadership Skills of Project Manager for a Successful Construction Project. International Academic Research Journal of Social Science, 1(2), 89–94.
Barrie, D. S., Paulson, B. C,. and Sudinarto., 1995. “Professional Construction Management”. Alih Bahasa : Sudinarto, Penerbit Erlangga, Jakarta.
Cox, R, F., Issa, R, R. A., and Ahrens, D., 2003. “Management’s Perception of Key Performance Indicators for Construction”. Journal of Construction Engineering and Managemnet.
Ekrot, B., Rank, J., & Gemünden, H. G. (2016). Antecedents of project managers’ voice behavior: The moderating effect of organization-based self-esteem and affective organizational commitment. International Journal of Project Management, 34(6), 1028–1042. https://doi.org/10.1016/j.ijproman.2015.10.011
Habbema, J.D.F, (1976). Multivariate Discriminantion Method for Top Quark Analysis, Techonometrics, 39, 91-99.
Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E., and Tatham, R. L., 2006. “Multivariate Data Analysis sixth edition”. Pearson International Edition.
Hosie, P., et al., (2004). “The Ipact of Global Pressures on The Affective Well-Being of Australian Managers’ Performance”. Research and Practice Management, 12 (1) : 134-171.
Johnson, R. A., and Wichern, D.W., 2002. “Applied Multivariate Statistical Analysis”. Pearson Education International.
Koesmono, T., 2005. “Pengaruh Budaya Organisasi Terhadap Motivasi dan Kepuasan Kerja Serta Kinerja Karyawan Pada Sub Sektor IndustriPengolahan Kayu Ekspor di Jawa Timur”. Disertasi Program Pasca Sarjana Universitas Airlangga, Surabaya.
Kuncoro, M., 2003. “Metode Riset untuk Bisnis dan Ekonomi”. Erlangga, Jakarta.
Mahmudi. 2005. Manajemen Kinerja Sektor Publik. Unit penerbit dan percetakan Akdemi Manajemen Perusahaan YKPN, Yogyakarta.
Meyer, J. P., Allen, N. J., and Gellatly, I. R., 1990. “Affective and Continuance Commitment to the Organization : Evaluation of Measures and Analysis of Concurrent and Time-Lagged Relations”. Journal of Applied Psychology, 75 (5) : 710-720.
McMurray, A. J., Scott, D. R., and Pace, R. W., 2004. “The Relationship Between Organizational Commitment and Organizational Climate in Manufacturing”. Human Resource Development Quartely, 15 (4).
Otok, B. W., 2007. Analisis Discriminan.
Robbins, S.P., 2001. Organizational Behavior. Buku 1, Alih Bahasa : Tim Indeks, PT. Indeks Kelompok Gramedia, Jakarta.
Robbins, S.P., 2003. Organizational Behavior. Buku 2, Alih Bahasa : Tim Indeks, PT. Indeks Kelompok Gramedia, Jakarta.
Sekaran, U., 2006. Research Methods for Business, 4th Ed. Buku I Penerjemah Kwan Men Yon, Salemba Empat, Jakarta.
Syah, M. S., 2004. Manajemen Proyek, Kiat Sukses Mengelola Proyek. PT.Gramedia Pustaka Utama, Jakarta.
Zhang, J., Li, H., Olanipekun, A. O., & Bai, L. (2019). A successful delivery process of green buildings: The project owners’ view, motivation and commitment. Renewable Energy. https://doi.org/10.1016/j.renene.2019.02.002
Refbacks
- Saat ini tidak ada refbacks.