Perancangan Sistem Pembangkit Listrik Biomassa Sawit (PLTBS) Kapasitas 5 MW

Ari Wibowo

Sari


Based on 2014 PLN statistic data, Riau and Riau Island Region peak load reached 261.02 MW, while installed power plant capacity of 166.62 MW capable power only 98.70 MW. This causes frequent rolling blackouts in the Riau city and its surrounding. On the other hand, Riau has huge renewable energy sources derived from oil palm industry. Palm Oil Mill (POM) are scattered throughout the region of Riau, where the plant produces biomass waste called empty fruit bunch (EFB), shell and fiber. These biomass waste especially EFB has very huge potency tobe converted to energy. The purpose of this study is to mapping the potencies of electrical energy generated from the biomass waste produced by two palm oil mills of PTPN V. Lubuk dalam POM and Sei Buatan POM has a very good performance over the last five year, with FFB processed an average over 200.000 ton/year. Biomass samples, then tested in the laboratory to obtain the calorific value. The expected electric power generated then analyzed based on the production data and the caloric value of the biomass waste. The calculation resulting 5 MWh electric power can be generated, with only use EFB from both POM as fuel feedstock of the boiler. The biomass power plant based on Rankine Cycle System. Four main equipment in the Rankine cycle, boiler, turbine-generator, condenser and pump, then calculated based on the power generated and availability of feedstock. The biomass power plant system designed with superheated steam with its pressure and temperature of 32 barg 400oC.

Teks Lengkap:

PDF

Referensi


Arieta, F., Teixeira, F., Yanez, E., Lora, E., and Castillo, E. (2007) Cogeneration potential in the Columbian palm oil industry: Three case studies, Biomass Bioenergy, 31, pp. 503-511

Basiron, Sukaimi, Ngan, Darus, Yusof (1985) Palm Oil Factory Process Handbook, Palm Oil Research Institute of Malaysia, Malaysia.

Departemen Energi dan Sumber Daya Mineral (2004) Rencana Umum Ketenagalistrikan Nasional

Harnowo, S. (2016) Analisis Kinerja Pembangkit Listrik Tenaga Biomasa Sawit (PLTBS) Pabatu PT Perkebunan Nusantara IV, Jurnal Mekanika dan Sistem Termal, Vol. 1(1), pp. 14-20.

International Renewable Energy Agency (2014) Bio Energy Forum, Bangkok.

J Dunn (2007) Thermodynamics Analysis.

Lacrosse, L. (2004) Clean and Efficient Biomass Cogeneration Technology in ASEAN, COGEN 3 Seminar on “Business Prospects In Southeast Asia For European Cogeneration Equipment”, 23 November 2004, Krakow, Poland.

Lynn Wright, Bob Boundy, Philip G Badger, Bob Periack, Stacy Davia (2009) Biomass Energy Data Book : Edition 2, Oak Ridge, Tenesse, US.

Lynn Wright, Bob Boundy, Philip G Badger, Bob Periack, Stacy Davia (2009) Biomass Energy Data Book : Edition 2, Oak Ridge, Tenesse, US.

Mujeebu and Abdullah (2009) Biomass Based Cogeneration and Trigeneration for Effective Heat Recovery and Waste Management.

Mustangin, M. dan Wibowo, A. (2013) Potensi Pembangkit Listrik Tenaga Biomassa Sawit PT Perkebunan Nusantara XIII (Persero) Cluster Kalimantan Timur, Forum Teknik : Majalah Ilmiah Teknologi, Vol.35, No.2.PLN (2015) Statistik PLN 2014. Sekretariat Perusahaan PLN

Quack, Knoof, Stessen (1999) Energy From Biomass, review of combustion and gassification, The International Bank for Reconstruction and Development/THE WORLD BANK, Washington D

Wibowo, A. (2015) Analisis Potensi Pembangkit Listrik Biogas Berbasis Limbah Cair Pabrik Kelapa Sawit Studi Kasus Pks PT Intan Sejati Andalan, Riau, Jurnal Teknik Vol. 5 No. 2.


Refbacks

  • Saat ini tidak ada refbacks.


Jurnal Mekanika dan Sistem Termal (ISSN : 2527-3841 ; e-ISSN : 2527-4910) diterbitkan oleh Universitas Janabadra dan telah terindeks oleh : Google Scholar

 

Free counters!